In this section we will discuss the status of the HET facility and each instrument and any limitation to configurations that occurred during the period.
  Commissioning, Engineering, and Guaranteed Time Report 
        There were 292 hours granted for engineering in the 20-3 period:
      
 There were 293.8 hours of eng/comm/GTO used (charged) in the
        20-3 period, in the following categories:
      
In 20-3 the engineering, commissioning, and GTO requests were
        again collected by the Science Operations Manager, and presented
        to the board. After the board approved these "off the top"
        allocations, the Science Operations Manager determined the TAC
        allocations and notified the TAC chairs at each partner
        institution, as described in the "Institution Status" section.
      
Month by Month Summary
The following table gives the observing statistics for each month. Column A gives the fraction of the month that was spent attempting science (as opposed to engineering or instrument commissioning). Science time is defined to begin at 18 degree evening twilight and end at 18 degree morning twilight. Column B gives the fraction of the possible science time (A) lost due to weather. The other columns give the amount of remaining science time (after removing weather losses) not spent attempting science targets. Please note that the first stack of the night often occurs before 18 degree twilight.
| Month | A: Fraction of the Time that was Possible Science | B: Fraction of Total Time Lost due to Weather | C: Fraction of Actual Science Time Spent with Shutter Open | D: Fraction of Actual Science Time Lost due to Overhead | E: Fraction of Actual Science Time Lost due to Alignment | F: Fraction of Actual Science Time Lost due to Problems | G: Fraction of Actual Science Time Not accounted for or Lost | 
|---|---|---|---|---|---|---|---|
| Aug | 0.907 | 0.265 | 0.624 | 0.286 | 0.0450 | 0.0448 | 0.0000 | 
| Sep | 0.934 | 0.387 | 0.658 | 0.254 | 0.0571 | 0.0309 | 0.0000 | 
| Oct | 0.829 | 0.230 | 0.651 | 0.279 | 0.0331 | 0.0368 | 0.0000 | 
| Nov | 0.938 | 0.238 | 0.620 | 0.284 | 0.0267 | 0.0692 | 0.0000 | 
The following tables give a break down of all attempted science visits as well as the category that each falls into.
| Charged exposures | ||
|---|---|---|
| Number of Times | Shutter Open (Hours) | Type | 
| 3809 | 366.52 | A - Acceptable | 
| 69 | 17.70 | B - Acceptable but Border line conditions | 
| 491 | 44.78 | 4 - Priority 4 visits (does not include 1/2 charge) | 
| 1 | 0.0 | Q - charged but PI error | 
| 0 | 0.0 | C - Acceptable by RA but PI rejects | 
| Uncharged exposures caught by RA | ||
|---|---|---|
| Number of Times | Shutter Open (Hours) | Type | 
| 0 | 0.00 | N - Rejected due to unknown cause | 
| 61 | 6.43 | E - Rejected for Equipment Failure | 
| 199 | 40.70 | W - Rejected for Weather | 
| 24 | 5.70 | H - Rejected for Human failure | 
| Uncharged exposures caught by PI | ||
|---|---|---|
| Number of Times | Shutter Open (Hours) | Type | 
| 11 | 3.52 | P - Rejected for weather | 
| 0 | 0.0 | F - Rejected for Equipment Failure | 
| 0 | 0.0 | T - Rejected for poor track choice | 
| 0 | 0.0 | X - Rejected for Human failure | 
| Acceptable but Uncharged exposures | ||
|---|---|---|
| Number of Times | Shutter Open (Hours) | Type | 
| 0 | 0.0 | I - Targets observed under otherwise idle conditions | 
The following setup statistics include slew, acquisition, and starting data collection script. The table below gives the average setup time for each instrument PER ACTUAL VISIT and the average and maximum COMPLETED charged science exposures and visits.
The "Exposure" is defined by when the (CCD) shutter opens and closes. A "Visit" is the requested total CCD shutter open time during a track and might be made up of several "Exposures". "Visit" as defined here contains no overhead. To calculate one type of observing efficiency metric one might divide the "Visit" by the sum of "Visit" + "Overhead".
 The average setup per visit is calculated from acceptable
      priority 0-3 (not borderline) science targets. This number
      reflects how quickly we can move from object to object on average
      for each instrument, however, this statistic tends to weight the
      setup for programs with large number of targets.
    
The average overhead percentage is calculated for each instrument
      and shows how much of that instrument's total time on sky
      (overhead+exposure) was overhead. NB: LRS2 has the smallest
      overhead %, but typical LRS2 observations use much longer
      exposures than VIRUS, even though VIRUS has a faster average setup
      time.
    
| Instrument | Avg Setup per Visit (min) | Total time exposed (hrs) | Overhead % | 
|---|---|---|---|
| VIRUS | 5.04 | 156.32 | 27.55% | 
| LRS2 | 6.69 | 76.93 | 27.40% | 
| HPF | 7.25 | 208.97 | 34.07% | 
The setup statistics can be shortened by multiple setups (each
      one counted as a separate visit) while on the same target such as
      moving from LRS2-B to LRS2-R.
    
      HETDEX time interruptions:
    
Within the times when HETDEX shots were available on-sky for >20 minutes, the following percentages summarize how the time was used:
    
      Overall time charged: 293.80h (eng/comm/GTO) + 413.64h (sci) =
      707.44h
      Total estimated science time available (in TAC time
      determinations): 670.76h
         Conclusion: weather was better than expectations.
    
    
    
In the table below we show the breakdown of the charged time for each program submitted. The "Total %" is the completion of the entire TAC time including P4 time. The last four columns show the completion rate for targets submitted in each priority bin. This completion rate is the greater of the targets completed percentage and the TAC allocation completed percentage in each priority bin.
| Institution | Tot exp | Tot OH | Tot Chrg | Tot TAC | Total % | P0 Completion | P1 Completion | P2 Completion | P3 Completion | 
|---|---|---|---|---|---|---|---|---|---|
|  | |||||||||
| G20-3-001 | 0.30 | 0.10 | 0.40 | 0.40 | 100% | 100% | |||
| G20-3-002 | 0.67 | 0.22 | 0.88 | 0.80 | 100% | 100% | |||
| G20-3-003 | 1.35 | 0.38 | 1.73 | 2.20 | 79% | 53% | 100% | ||
| M20-3-001 | 1.58 | 0.87 | 2.45 | 2.30 | 100% | 100% | 100% | ||
| M20-3-002 | 2.75 | 0.33 | 3.08 | 3.00 | 100% | 100% | 100% | ||
| M20-3-003 | 8.43 | 4.01 | 12.44 | 16.50 | 75% | 100% | 100% | 37% | |
| M20-3-004 | 1.65 | 0.55 | 2.20 | 2.00 | 100% | 100% | |||
| PSU20-3-001 | 0.00 | 0.00 | 0.00 | 0.50 | 0%(P4) | ||||
| PSU20-3-002 | 1.60 | 0.00 | 1.60 | 6.33 | 25%(P4) | ||||
| PSU20-3-003 | 2.67 | 0.48 | 3.15 | 5.50 | 57% | 57% | |||
| PSU20-3-004 | 4.00 | 0.65 | 4.65 | 4.66 | 100% | 100% | 100% | ||
| PSU20-3-005 | 0.00 | 0.00 | 0.00 | 1.93 | 0% | TD |  | ||
| PSU20-3-006 | 8.50 | 2.97 | 11.47 | 13.16 | 87% | 100% | 100% | 90% | |
| PSU20-3-007 | J* | J* | J* | J* | J* | J* | J* | J* | |
| PSU20-3-008 | 5.40 | 0.90 | 6.30 | 6.50 | 97% | 100% | |||
| PSU20-3-009 | 2.50 | 0.83 | 3.33 | 3.23 | 100% | 100% | |||
| PSU20-3-010 | 4.30 | 1.51 | 5.81 | 6.57 | 88% | 100% | |||
| PSU20-3-011 | 3.54 | 0.95 | 4.49 | 5.17 | 87% | 100% | 100% | 50% | |
| PSU20-3-012 | 0.00 | 0.00 | 0.00 | 0.38 | 0%(P4) | ||||
| PSU20-3-013 | 1.04 | 0.27 | 1.32 | 5.20 | 25% | 100% | |||
| PSU20-3-014 | 31.83 | 8.22 | 40.05 | 39.99 | 100% | 100% | 100% | 100% | 100% | 
| PSU20-3-015 | 0.00 | 0.00 | 0.00 | 5.40 | 0%(P4,NT) | ||||
| PSU20-3-016 | 0.00 | 0.00 | 0.00 | 5.33 | 0%(P4) | ||||
| PSU20-3-017 | 0.08 | 0.00 | 0.08 | 2.28 | 4%(P4) | ||||
| PSU20-3-018 | 0.66 | 0.00 | 0.66 | 8.00 | 8%(P4) | ||||
| PSU20-3-019 | 1.25 | 0.30 | 1.55 | 2.00 | 78% | 100% | 75% | ||
| UT20-3-001 | 5.75 | 1.25 | 7.00 | 10.00 | 70% | 100% | 38% | ||
| UT20-3-002 | 7.71 | 1.45 | 9.16 | 13.00 | 70% | 100% | 100% | ||
| UT20-3-003 | 0.00 | 0.00 | 0.00 | 2.00 | 0%(P4) | ||||
| UT20-3-004 | 5.71 | 1.87 | 7.58 | 12.00 | 63% | 90% | |||
| UT20-3-005 | J* | J* | J* | J* | J* | J* | J* | J* | J* | 
| UT20-3-006 | 7.67 | 1.35 | 9.02 | 14.00 | 64% | 100% | 100% | ||
| UT20-3-007 | 7.53 | 1.21 | 8.73 | 9.50 | 92% | 100% | 100% | ||
| UT20-3-008 | 5.51 | 3.01 | 8.51 | 14.90 | 57% | 100% | 100% | ||
| UT20-3-009 | 33.53 | 7.34 | 40.87 | 63.00 | 65% | 96% | 98% | ||
| UT20-3-010 | 22.12 | 12.05 | 34.17 | 49.20 | 69% | 97% | 100% | ||
| UT20-3-011 | 0.75 | 0.00 | 0.75 | 5.00 | 15%(P4) | ||||
| UT20-3-012 | 7.74 | 16.30 | 24.04 | 41.50 | 58% | 100% | 83% | ||
| UT20-3-013 | 30.41 | 5.61 | 36.02 | 38.60 | 93% | 100% | 100% | 100% | 100% | 
| UT20-3-014 | 10.32 | 3.72 | 14.04 | 24.60 | 57% | 100% | 100% | 100% | |
| UT20-3-015 | 1.60 | 1.03 | 2.63 | 9.50 | 28% | 100% | 67% | ||
| UT20-3-016 | 8.50 | 1.23 | 9.73 | 10.00 | 97% | 100% | |||
| UT20-3-017 | 2.53 | 1.77 | 4.30 | 8.40 | 51% | 100% | |||
| UT20-3-018 | 10.47 | 2.60 | 13.07 | 17.10 | 76% | 100% | 100% | 98% | |
| UT20-3-019 | 8.33 | 1.10 | 9.43 | 15.00 | 63% | 100% | |||
| UT20-3-020 | 5.17 | 1.07 | 6.23 | 16.00 | 39% | 100% | |||
| HET20-3-100 | 115.50 | 39.17 | 154.67 | 155.00 | 99.8% | 100% | |||
| HET20-3-201 | 8.33 | 1.25 | 9.58 | 10.00 | 96% | 100% | 100% | 100% | |
| HET20-3-300 | 15.84 | 4.11 | 19.94 | 20.00 | 99.7% | 100% | 100% | 100% | |
| Joint prog: UT20-3-005 PSU20-3-007 | 50.11 | 10.60 | 60.70 | 57.97 | 100% | 100% | 100% | 100% | 100% | 
| Institution | Tot. Open | Tot OH | Tot Chrg | Tot TAC | Total % | P0 completion | P1 completion | P2 completion | P3 completion | 
      
      J* = joint program between UT, PSU, and Munich - see
      summary at bottom of table
      NT = no (or very late-in-trimester) targets
      submitted at this priority (even though time was allocated)
      HC = HETDEX conflict (targets submitted were in
      direct competition with HETDEX; PI was aware of issue)
      SI = Seasonally inappropriate (target had limited
      availability during trimester because of twilights)
      TD = Time Domain targets (either none submitted or
      submitted targets unreachable due to weather)
      * = HETDEX nominal exposures+overhead at 178.88h but
      total on-sky time was 187.0h due to OCD's exposure extensions
    
| Program Completion Rates | |||
|---|---|---|---|
| Priority | Average Completion | Median Completion | |
| P0 | 99.7% | 100% | |
| P1 | 99.9% | 100% | |
| P2 | 96.5% | 100% | |
| P3 | 85.2% | 98% | |
Time charged rates (for all science programs): fraction of each
      priority's allocation actually charged:
    
| Priority | UT* [h] chrg/allow | PSU* [h] chrg/allow | M [h] chrg/allow | G [h] chrg/allow | GTO [h] chrg/allow |  | Percent | 
| P0 | 21.51/23.20 | 7.53/8.20 | 2.20/1.80 | 0.40/0.30 | 160.08/160.50 | 98.8% | |
| P1 | 67.14/69.40 | 19.30/24.70 | 6.36/5.60 | 0.88/0.80 | 10.50/10.60 | 93.8% | |
| P2 | 95.78/92.50 | 28.32/33.00 | 8.72/7.40 | 0.58/1.00 | 13.61/13.91 | 99.5% | |
| P3 | 89.88/92.50 | 24.12/33.00 | 2.89/7.40 | 1.15/1.00 | 88.2% | ||
| P4 | 31.67 | 5.17 | 
*note that time charged to the joint program
      UT20-3-005+PSU20-3-007 is reported only as UT time in this table
    
      
    
 Below we show how the TAC allocations were
        determined.
      
    
| quantity | Aug (hrs) | Sep (hrs) | Oct (hrs) | Nov (hrs) | Total (hrs) | 
| 18deg-18deg | 243.93 | 268.10 | 306.58 | 318.17 | 1136.78 | 
| Weather-insensitive engineering time | 5.00 | 5.00 | 5.00 | 0.00 | 15.00 | 
| "Operational" time | 238.93 | 263.10 | 301.58 | 318.17 | 1121.78 | 
| Weather loss frac. | 0.416 | 0.504 | 0.290 | 0.245 | |
| Efficiency loss frac. (align+PRs) | 0.094 | 0.098 | 0.094 | 0.094 | |
| "Clear science" time | 126.42 | 117.71 | 194.00 | 217.64 | 655.76 | 
| Com/Eng/GTO time | 252.00 | ||||
| "Allowed" hours given to TACs for science | 403.76 | 
(note that the HET Operational engineering time allocation of 15h
      was later increased to 40h in Sept 2020 by the HET Board)
      
    
| Partner | Share | Notes | Total hours allowed | 
| Goettingen | 0.0085 | 3.4 | |
| Munich | 0.0590 | 23.8 | |
| PSU | 0.2568 | time trade: 103.69 - 4.75 | 98.9 | 
| UT | 0.6757 | time trade: 272.82 + 4.75 | 277.6 | 
      This is how each institution had
        allocated its time by priority in the 20-3 trimester. 
| Time Allocation by Institution (hours) | |||||||
|---|---|---|---|---|---|---|---|
| Institution | Priority 0 | Priority 1 | Priority 2 | Priority 3 | Priority 4 | Total P0-P3 | Frac. of allowed | 
| Goettingen | 0.40 | 0.80 | 1.10 | 1.10 | - | 3.40 | 100.0% | 
| Munich | 2.00 | 6.00 | 7.90 | 7.90 | - | 23.80 | 100.0% | 
| PSU | 7.73 | 24.76 | 33.64 | 33.50 | 40.67 | 99.63 | 100.7% | 
| UT | 23.10 | 69.40 | 92.30 | 92.10 | 139.70 | 276.90 | 99.7% | 
| Other allocations | |||||||
| GTO | 160.5 | 10.60 | 13.90 | - | - | 185.00 | 100.0% | 
Notes:
      1) PSU knowingly over-allocated beyond their time allowed, but
      their time charged (across all priorities) did not exceed their
      time allowed.
    
    
    
| Accumulated deficits for each partner | UT | PSU | M | G | total sci hours | |
| FY2015-2016 | +4.6 | -6.9 | +1.1 | +1.2 | 40.49 | |
| FY2016-2017 | +22.7 | -22.8 | +0.8 | -0.8 | 439.56 | |
| FY2017-2018 | +37.7 | -21.9 | -14.7 | -1.2 | 887.71 | |
| FY2018-2019 | +43.0 | -32.0 | -10.8 | -0.2 | 1401.17 | |
| FY2019-2020 | +48.9 | -48.4 | +0.6 | -1.1 | 2101.82 | |
| FY2020-2021 including only 20-3 | +37.1 | -41.3 | +4.8 | -0.7 | 2515.46 | 
NB: a more comprehensive annual partner fractional time charging
      analysis is produced separately from these trimester reports; a
      current copy can be provided upon request.
    
      
    
Below are the summaries of the Guaranteed Time Observations (GTO) programs granted by the Board:
| GTO and Special Time Charged by Project (hours) | |||||
|---|---|---|---|---|---|
| Project | Allocated in 20-3 | Allocated total to date including 20-2 | Charged in 20-2 | Charged total to date including 20-2 | |
| HETDEX (HETYY-P-100) | 155.0 | 1821.0 | 154.67 | 1279.97 | |
| LRS2 GTO (HETYY-P-2XX) | 10.0 | 155.94 | 9.58 | 85.19 | |
| HPF GTO (HETYY-P-3XX) | 20.0 | 140.40 | 19.94 | 141.31 | |
| GW (HETYY-P-400) | 0.00 | 70.00 | 0.00 | 12.37 | |
(Totals to date start from the 11-2 period)
      SJ, Dec 1 2020